Publications

Export 748 results:
Author [ Title(Desc)] Type Year
Filters: First Letter Of Title is S  [Clear All Filters]
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
S
O’Leary DP.  2003.  Scaling symmetric positive definite matrices to prescribed row sums. Linear Algebra and its Applications. 370:185-191.
Kembhavi A, Siddiquie B, Miezianko R, McCloskey S, Davis LS, Schwartz WR, Harwood D, Gupta A, Farrell R, Luo Y et al..  2009.  Scene it or not? incremental multiple kernel learning for object detection Proceedings of the International Conference on Computer Vision.
Ye Q, Doermann D.  2013.  Scene Text Detection via Integrated Discrimination of Component Appearance and Consensus.
Srinivasan A.  1997.  Scheduling and load-balancing via randomization. TR11/97
Choi S, Agrawala AK.  1998.  Scheduling Aperiodic and Sporadic Tasks in Hard Real-Time Systems. Technical Reports from UMIACS, UMIACS-TR-97-44.
Plaisant C, Shneiderman B, Battagtia J.  1993.  Scheduling home control devices: a case study of the transition from the research project to a product. Sparks of innovation in human-computer interactionSparks of innovation in human-computer interaction. :205-205.
Plaisant C, Shneiderman B.  1992.  Scheduling home control devices: design issues and usability evaluation of four touchscreen interfaces. International Journal of Man-Machine Studies. 36(3):375-393.
Chang C, Sussman A, Saltz J.  1997.  Scheduling in a high performance remote-sensing data server. Proceedings of the Eighth SIAM Conference on Parallel Processing for Scientific Computing. SIAM.
Andrade H, Kurc T, Sussman A, Saltz J.  2002.  Scheduling multiple data visualization query workloads on a shared memory machine. Parallel and Distributed Processing Symposium., Proceedings International, IPDPS 2002, Abstracts and CD-ROM. :11-18.
Kumar V, Marathe M, Parthasarathy S, Srinivasan A.  2005.  Scheduling on Unrelated Machines Under Tree-Like Precedence Constraints. Approximation, Randomization and Combinatorial Optimization. Algorithms and TechniquesApproximation, Randomization and Combinatorial Optimization. Algorithms and Techniques. 3624:609-609.
Anil Kumar V, Marathe M, Parthasarathy S, Srinivasan A.  2009.  Scheduling on Unrelated Machines under Tree-Like Precedence Constraints. Algorithmica. 55(1):205-226.
Plaisant C, Shneiderman B.  1991.  Scheduling on-off home control devices. Proceedings of the SIGCHI conference on Human factors in computing systems: Reaching through technology. :459-460.
Bhattacharyya SS, Lee EA.  1993.  Scheduling synchronous dataflow graphs for efficient looping. The Journal of VLSI Signal Processing. 6(3):271-288.
Demaine ED, Ghodsi M, Hajiaghayi MT, Sayedi-Roshkhar AS, Zadimoghaddam M.  2007.  Scheduling to minimize gaps and power consumption. Proceedings of the nineteenth annual ACM symposium on Parallel algorithms and architectures. :46-54.
Bateni MH, Golab L, Hajiaghayi MT, Karloff H.  2009.  Scheduling to minimize staleness and stretch in real-time data warehouses. Proceedings of the twenty-first annual symposium on Parallelism in algorithms and architectures. :29-38.
Roussopoulos N, Mark L.  1985.  Schema manipulation in self-describing and self-documenting data models. International Journal of Parallel Programming. 14(1):1-28.
Haas BJ, Berriman M, Hirai H, Cerqueira GG, LoVerde PT, El-Sayed NM.  2007.  Schistosoma mansoni genome: Closing in on a final gene set. Experimental Parasitology. 117(3):225-228.
LoVerde PT, Hirai H, Merrick JM, Lee NH, El-Sayed NM.  2004.  Schistosoma mansoni genome project: an update. Parasitology International. 53(2):183-192.
Wu W, Niles EG, El-Sayed NM, Berriman M, LoVerde PT.  2006.  Schistosoma mansoni (Platyhelminthes, Trematoda) nuclear receptors: Sixteen new members and a novel subfamily. Gene. 366(2):303-315.
Bertotti G, Mayergoyz ID.  2006.  The Science of Hysteresis: Mathematical modeling and applications.
O'Leary DP.  2009.  Scientific Computing with Case Studies.
Minker J.  2012.  Scientific Freedom and Human Rights. :564.
Lansky AL, Getoor L.  1995.  Scope and abstraction: Two criteria for localized planning. INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE. 14:1612-1619.
Sarcia S A, Basili VR, Cantone G.  2009.  Scope error detection and handling concerning software estimation models. Proceedings of the 2009 3rd International Symposium on Empirical Software Engineering and Measurement. :123-132.
Hicks MW, Foster JS.  2010.  SCORE: agile research group management. Commun. ACM. 53(10):30-31.

Pages